Concept Study for Treatment of Radioactive Materials Generated during Decommissioning Projects for EnBW Kernkraft GmbH (EnKK)
Contract
Within the framework of EnBW decommissioning planning, NUKEM developed a waste treatment strategy for Neckarwestheim NPP units 1 and 2 and Philippsburg NPP units 1 and 2.
Description
The study for EnKK covers the following:
Analysis of waste streams in the context of decommissioning activities at four reactor units
Development of an overall concept for waste treatment
Calculations of waste streams and process throughput
Conceptual analysis based on the market price method
Development of a conceptual design for a waste treatment centre
Cost calculations for the selected design concepts
The outcomes of the study define the basic approaches to waste treatment.
Services
NUKEM Technologies provided the following services:
Analysis of various aspects of the waste treatment:
Sorting
Segmentation and decontamination
Retrieval techniques
Size-reduction techniques
Documentation and waste tracking
Procurement of equipment
Waste treatment by external contractors
Elaboration of waste treatment concepts
Development of basic design concepts for waste treatment centres and interim storage facilities