MHI Fukushima Studies for Remotely Controlled Operations
Contract
Having successfully completed the first project, NUKEM was again tasked by Mitsubishi Heavy Industries, Ltd with performance of additional feasibility studies to evaluate critical aspects associated with remotely controlled operations at the damaged reactor of Fukushima I and to identify the main risks.
Description
The project consisted of four studies:
Cost estimation for a hot cell intended to sample molten fuel
Arrangement of penetrations in the walls separating the reactor from the waste treatment building, including remote installation of two shielding gates
Designing a cell complex for measuring and packaging of samples taken from molten fuel
Remote installation of a shutoff damper isolating access to the reactor containment
Services
NUKEM provided the following services:
Comprehensive evaluation method for the selection of the most suitable concepts
Development of a conceptual design for preferred options
3-D modelling of working areas that covers various scenarios and special equipment
Preparation of process flow diagrams, detailed cost estimations, engineering plans and operational sequences
Recommendations with regard to standard technologies which are mostly suitable for the selected concepts, suggestions for improvement.
Questions? We are here for you.
Fast, personal and competent - get in touch with us.